Related Items:

Deslauriers Lifting Bracket- sold in pairs

Deslauriers Lifting Bracket- sold in pairs

Price: $34.00

Deslauriers Heavy Duty Lifting Bracket- sold in pairs

Deslauriers Heavy Duty Lifting Bracket- sold in pairs

Price: $95.00

Item #: STY-FRM-27-97x250
Availability: Stock
Usually ships In 2-5 Business Days
  • Made of 26 Gauge Steel- Hot Dip Galvanized
    Rib Space: 3.80 in
    18 SF (11.9 lbs.) per sheet
  • Applications from Pile caps and footings to blind side walls and tunnels.
    Concrete pours in 3 to 4 foot lifts are preferable with this forming system.
    Meets requirements of ASTM A653 and ASTMC847
  • Easy rebar and conduit penetrations
  •  Visual inspection of concrete pour and consolidation
  •  Retains surrounding soil while forming below grade structures
  • Permits water to run out of formwork during concrete pour
  • Packed: 250 sheets/pallet 4500 SF
  • Shipping via Common Carrier. Call for shipping rates

Price: CALL

    Quantity:
    Dayton Superior A110 Metal Rib
    Stay-In-Place Formwork for Concrete  
    is the formwork solution for tough forming situations. It can be cut in the field with tin snips, and be bent to form curves. Metal Rib is versatile enough for any type or size structure.

    Installation

    4”-8” minimum lap between running Stay-Form sheets

     2-rib minimum lap between stacked Stay-Form sheets

    Tie wire around rib and bracing is recommended.

    Bracing where sheets lap is also recommended.

    Attach Stay-Form to bracing with wire, staples, roofing nails or similar.

    Notch ribs to make 90 degree turns; ribs face into the concrete pour.

    Cut Stay-Form sheets with a grinder, cutoff saw, abrasive blade or tin snips.